Please use this identifier to cite or link to this item:
https://elibrary.khec.edu.np:8080/handle/123456789/594
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Dr. Pradip Kumar Shrestha | - |
dc.contributor.author | NABA RAJ DANGI (750251) | - |
dc.contributor.author | PAWAN DANGOL (750259) | - |
dc.contributor.author | SANDESH TIMILSENA (750276 | - |
dc.contributor.author | SAURABH THAPA (750282) | - |
dc.contributor.author | SIMON MANANDHAR (750284) | - |
dc.date.accessioned | 2023-09-13T05:26:06Z | - |
dc.date.available | 2023-09-13T05:26:06Z | - |
dc.date.issued | 2023 | - |
dc.identifier.uri | https://elibrary.khec.edu.np/handle/123456789/594 | - |
dc.description.abstract | Road transport is the primary means of transportation in Nepal. It promotes socio-economic development of a nation and other various development works won’t be possible without it. Relating the importance of road transport, Government of Nepal launches various road project for movement of people and goods and their connectivity and expenses a lot of economy in road development sector of the country. Our road project aims to design and construct District (assumed) type of road in Suryabinayak which starts from Suryabinayak Ganesh temple to Kalitar road, which is approximately around 2088 m and its overall cost estimation using SW Road V2 software. The work was carried out through topographic survey of the section using open traverse method by Total Station. Then using by SW Roads V2 software contour map of the place was created. Pavement is designed by road note 31 catalogues after conducting CBR test of sub grade soil of three different sample. For the design of feeder road, we follow Nepal Road Standard 2070 and for quantity and cost estimation we use DoR guideline and district rate. The aim of final project work is to achieve the level of knowledge and practical understanding how to construct and design road and its overall cost estimation. This report is an outcome of hard work and perseverance. Any opinions, suggestions or criticism for the project would be fruitful. | - |
dc.language.iso | Eng | - |
dc.title | DETAILED ENGINEERING SURVEY, DESIGN AND COST ESTIMATION OF SURYABINAYAK GANESH TEMPLE TO KALITAR ROAD | - |
dc.type | Report | - |
local.college.name | Khwopa Engineering College | - |
local.degree.department | Department of Civil | - |
local.degree.name | BE Civil | - |
local.degree.level | Bachelor's Degree | - |
local.item.accessionnumber | D.1311 | - |
Appears in Collections: | Civil Report |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
GROUP Q FINAL YEAR PROJECT REPORT.pdf Restricted Access | 7.03 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.